Users enter purchase terms, available operating records, transfer requirements, and remaining investment assumptions for each option. The tool exposes information and rights differences rather than treating a lower stated price as automatic value.
For an export, select Download in the tool, then Save file when it appears below. Your entries stay in your browser.
What Is This Article About?
This guide explains a tool for comparing a new DST purchase with a proposed purchase from an existing owner. It puts purchase cash, ownership share, available records and transfer conditions in one file. An optional calculation compares acquisition cost per percentage point of ownership when the entered terms meet the tool's checks. The result helps expose gaps and differences without calling a lower price a better investment.
Table of Contents
- What the DST Interest Comparator Does
- Define the Purchase Before Comparing Prices
- Enter Purchase Cash and Ownership
- Record Six Types of Evidence
- When the Ownership Cost Calculation Is Available
- Work Through the Fictional Example
- Read Dates and Remaining Assumptions Together
- Use the Comparison to Ask Better Questions
- Save the Full Result and Understand the Limits
- FAQ
- About Sequoia Research
- Sources
What the DST Interest Comparator Does
The tool compares two to four user-entered purchase options in U.S. dollars. Each option has a purchase type, issuer, security class, ownership percentage, price and extra buyer charges. It also holds notes about six areas that affect the comparison. You supply every fact and source reference.
A primary purchase generally refers to acquiring an interest through an offering. A secondary purchase generally refers to buying an existing interest from its owner. Those labels describe the route being considered. They do not establish whether the purchase is allowed, whether a seller exists or whether the interest is worth the stated price.
The output shows acquisition cash where the necessary amounts and cost confirmation are present. It lists missing records, compares the entered descriptions and shows differences in quote dates. It can also calculate cost per one percentage point of ownership for a pair that passes the stated comparison checks.
It does not search a marketplace, retrieve a private file or check a document's truth. “Provided” is your evidence label. Three supplied fields are not a three-star rating. The tool counts records to make unfinished work visible, not to predict safety or investment results.
The SEC warns that private placements can be illiquid, provide limited disclosure and expose investors to a total loss. An organized comparison does not remove those risks. A secondary route also does not create a guaranteed exit for either party. SEC private-placement bulletin, updated September 21, 2026.
Define the Purchase Before Comparing Prices
Start with the legal issuer and the class of interest. Two offerings from one sponsor can own different property or have different terms. A similar property name is not enough. Use the documents to identify what each proposed buyer would actually acquire.
Next describe the ownership percentage. A $100,000 purchase for 1% of an issuer is not directly comparable with an $80,000 purchase for 0.5%. The tool uses the percentage you enter. It does not derive ownership from a minimum investment, a seller's original check or a headline property value.
The description should explain payment rights as well. Does the price include rights to existing reserves? Who receives a payment near closing? Are there charges, preferences or other terms that make one class different? The tool records the answers but cannot interpret the contracts for you.
A proposal can be worth researching even when these answers are missing. Leave the missing amounts blank and the evidence status open. The tool can still organize the remaining records. It will withhold the cost comparison when a required input is absent.
Transfer permission needs a separate review. The SEC's restricted-securities guidance describes resale conditions beyond a holding period. It does not say that every private interest becomes freely tradable after a fixed time. Confirm the legal route and the trust's terms with the appropriate professionals. SEC restricted-securities guidance.
Enter Purchase Cash and Ownership
For each option, enter a positive purchase price or leave it blank if unknown. Enter extra buyer acquisition charges separately. Use zero only when you have checked that no additional charges belong in your stated scope. A blank charge field remains unknown.
Use plain dollar amounts with at most two decimal places. Do not include commas, currency signs or exponent notation. Each price or charge input can be no more than $1 billion. Ownership must be greater than zero and at most 100%, with up to four decimal places; for example, enter 0.8 for 0.8%.
The cost note should explain what the price already includes. If a quote includes a charge, do not add it again in the extra-charge field. Check the separate confirmation only when the two money fields cover the acquisition cash in your defined scope without overlap.
The entered acquisition cash is the purchase price plus those additional charges. The tool withholds that total if either amount is blank or the cost confirmation is unchecked. It still retains the known inputs. This prevents a known price and an unknown fee from appearing as a complete purchase cost.
The SEC's fee bulletin distinguishes transaction costs from ongoing costs and points readers to account and product disclosures. Use those records to decide what belongs in your acquisition budget. This tool does not calculate future advisory fees, property expenses or lifetime investment costs. SEC fee bulletin, July 23, 2025.
Record Six Types of Evidence
Each option contains the same six record fields. Open each field to enter its status, terms or open question, source reference and document date. The source can include a document title, page, file location or URL. It is saved as text and is not opened or verified by the tool.
Operating records should identify the period covered and what the report measures. A six-month property statement differs from a full-year forecast. State whether the figures describe the whole property, the trust or the seller's interest. The tool does not compare income figures across those scopes.
Transfer or subscription requirements should describe required steps and conditions still open. A primary option may need subscription acceptance. A secondary proposal may need legal review, documents, an ownership-record change or consent under its terms. A supplied clause does not prove that the conditions have been satisfied.
Payment rights should explain what ownership includes and when the buyer receives payments. This field is central to the optional cost comparison. A percentage only helps compare costs when the rights attached to that percentage are equivalent.
The remaining business plan should state the current assumptions and their date. An older original forecast may cover years that have already passed. Record the current plan being used, including any expected hold extension, without treating an expected exit as a fixed promise.
Reserve records should identify the account owner, balance date and use limits. Debt records should identify the relevant balance, maturity and terms. A price below an earlier purchase amount does not answer either question.
The four statuses are Unknown, Requested, Provided and Unavailable. Provided requires a description, a source reference and a document date. The other statuses can retain partial notes. They remain open items even when text has been entered. The count of Provided fields always uses six as its denominator.
When the Ownership Cost Calculation Is Available
The tool compares all pairs among the entered options. Two options create one pair; four create six. Each pair can pass or fail the calculation checks independently. Entering different issuers in one file is allowed, but their ownership-cost comparison is withheld.
To calculate a pair, both options need known price, known extra charges, valid ownership, a quote date and quote reference. Both cost-scope confirmations must be checked. Each also needs a complete Provided payment-right record. The issuer and security-class labels must match after trimming spaces, merging repeated spaces and ignoring letter case.
You must also check the overall confirmation that the compared options have equivalent economic rights per ownership percentage and use U.S. dollars. Matching labels alone cannot establish that fact. Explain the basis for your confirmation in the scope note. Do not check it simply to reveal a result.
The calculation divides each option's entered acquisition cash by its ownership percentage. If $102,500 buys 1%, the cost is $102,500 per one percentage point. If $78,400 buys 0.8%, the cost is $98,000 per one percentage point. This is not a claim that a buyer can purchase any desired fraction at that rate.
Each normalized cost is rounded half-up to cents. The displayed difference subtracts the rounded first cost from the rounded second cost. It is a cash-cost difference, not a discount to fair value. The tool never labels the lower figure a winner.
Open operating, debt, reserve or transfer questions do not automatically block this limited arithmetic. They remain visible beside it. The result can describe quoted acquisition cash while permission to close or the investment's merits remain unresolved. Do not treat a calculated pair as an approval to purchase.
Work Through the Fictional Example
The example uses an invented issuer, Cedar Quay DST. It is not a current offering or a report about a real buyer or seller. Both options are assumed to have the same Class A economic rights per ownership percentage.
The fictional primary quote offers 1% for $100,000, with $2,500 in separate buyer charges. Entered acquisition cash is $102,500. The fictional secondary quote offers 0.8% for $76,000, with $2,400 in separate charges. Its entered acquisition cash is $78,400.
The normalized costs are $102,500 and $98,000 per percentage point. The second-minus-first result is negative $4,500. That comparison accounts for the different ownership quantities. Comparing the raw checks alone would mix a cost difference with a quantity difference.
The primary option has three Provided record fields: operating records, payment rights and remaining plan. The secondary option has two: payment rights and remaining plan. Transfer review is Requested for both. Reserve and debt fields are Unknown. The secondary operating report is also Requested.
The dates matter. The review date is October 16, 2026. The primary quote is dated October 1, making it 15 calendar days old. The secondary quote is dated October 10, making it six days old. The second quote is nine days later. The tool reports these intervals without deciding when a quote becomes stale.
Try removing the secondary charge amount. Its acquisition total and the pair's cost comparison disappear, while the other evidence remains. Entering a checked zero restores the cash calculation under that changed assumption. It does not establish that an actual provider waived a fee.
Then uncheck equivalent rights. Both entered acquisition totals remain available, but the pair comparison is withheld. That is the intended distinction between adding a purchase budget and asserting a common basis for comparing ownership costs.
Read Dates and Remaining Assumptions Together
The review date cannot be later than the current UTC date. Quote dates and document dates cannot be later than the review date. Dates must be real calendar dates between 1900 and 2200. These rules prevent a future document from appearing as evidence already available at the selected review point.
A future plan date is different from a document date. A report written today might discuss a loan due in 2032. Put that future maturity in the terms text and use the report's actual date in the date field. The tool does not compute legal notice dates or remaining loan terms.
For operating records, write the reporting period in the description. A July report can cover January through June. The document date alone cannot explain the time span or the accounting basis. No automatic test in this tool determines whether two operating reports are comparable.
The output flags identical or different entered descriptions. Identical text can come from the same copied claim. Different wording can still describe similar rights. These flags are prompts for a person to read the records, not findings that the investments are equivalent or different.
Keep later changes visible in your saved files. A revised price, a new debt report or an amended payment term can change the comparison. Update the inputs and build a new result. The tool does not keep a revision history for you.
Use the Comparison to Ask Better Questions
Start with gaps that could change the cash or rights being acquired. If ownership is unknown, obtain the interest schedule. If buyer charges are incomplete, request a scoped quote. If rights differ, ask whether a valid comparison is possible rather than adjusting a number to make the options look similar.
For a secondary proposal, ask what recent records the seller can provide and what must come from the issuer or manager. A seller's past distribution statement does not, by itself, establish future payments. Nor does it explain all property debt, reserve limits or unresolved operating issues.
For a primary proposal, ask whether the forecast uses current information and which charges are included in the subscription amount. The offering label should not replace source review. The same evidence questions apply even when a packet looks complete.
There may be good reasons to stop comparing a pair. Different classes, property interests or payment rights can make a price-per-percentage calculation unhelpful. Keep those differences in the file and compare the actual risks and terms with qualified help. The tool does not force a common score across unlike investments.
Save the Full Result and Understand the Limits
Use the full JSON or text export after building a comparison. Both preserve all entered options, the six records for each option, source notes, gaps and pair results. Collapsing a record panel does not remove it from the export. The tool does not automatically save, upload or restore files.
Editing any input clears the old result and disables exports until you compare again. Adding or removing an option does the same. Removing an option, loading the example and clearing all entries use an on-page confirmation with Confirm and Cancel. Editing while a confirmation is open cancels that pending action.
A rejected input leaves the entered forms intact. Correct the date, amount or required field and rebuild. Deleting one option preserves the other option forms. The remaining file still needs at least two options before it can produce a comparison.
Exports may contain private transaction notes. Choose what you enter and where you keep the downloaded file. The tool is an organizing and arithmetic aid. It does not inspect underlying agreements, contact parties, establish suitability or estimate the chance that a transfer will close.
FAQ
Does a lower secondary price mean better value?
No. It may reflect different rights, timing, information or risk. The tool calculates entered acquisition costs on a confirmed ownership basis. It does not estimate fair value or future cash. Review the operating records and remaining plan before drawing an investment conclusion.
Why is the cost comparison withheld when I entered both prices?
Price alone is not enough. The tool also needs ownership, extra charges, the cost confirmations, quote references and dates, complete payment-right records, matching issuer and class labels, and your equivalent-rights confirmation. The output lists the missing conditions so you can address them.
Can I compare different DST issuers in one file?
Yes, you can organize their records side by side. The tool withholds normalized ownership-cost comparisons when issuer or class labels differ. A percentage of one issuer does not represent the same asset as a percentage of another issuer.
Does Provided mean someone verified the document?
No. It means you supplied a description, source reference and date under that label. The tool does not fetch the source or assess its accuracy. A Provided transfer clause can still contain conditions that have not been met.
Should unknown buyer fees be entered as zero?
No. Leave the amount blank until known. Zero means you have checked that no extra charge belongs in your defined scope. A blank amount withholds the acquisition total and related cost comparison while retaining the known inputs and notes.
Will the tool tell me whether a secondary transfer is allowed?
No. It records the requirements and open questions you enter. The issuer's agreements, securities-law rules and transaction facts need professional review. A calculated cost comparison does not establish permission, a willing seller, a valid closing date or available liquidity.
About Sequoia Research
Sequoia Research, LLC provides independent research on DSTs and other real estate investment offerings. This educational library helps readers compare source documents, understand assumptions and prepare questions for qualified professionals.
Sources
- SEC Private Placements Under Regulation D, original August 17, 2022; updated September 21, 2026.
- SEC Restricted Securities, undated current guidance; read October 17, 2026.
- SEC How Fees and Expenses Affect Your Investment Portfolio, July 23, 2025; read October 17, 2026.